PLEASE NOTE: When powering up the DGP-NE96 control panel (V1.02 or higher), the panel
will begin a module scan to verify if all the modules connected to the panel are operational. The
scanning process will take between 30 and 120 seconds to complete depending on the number
of modules connected to the control panel. The module scan is complete when the LCD keypad
begins to show the partition status. Only after the module scan is complete will the control panel
be fully operational.