SEKURE ITI UltraGard Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para Sistemas de segurança - controlo de acesso SEKURE ITI UltraGard. SEKURE ITI UltraGard User manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 0
CARBON MONOXIDE MONITORING
AND SHUTDOWN SYSTEM
MODEL 12V
QUICK INSTALLATION TIPS AND TROUBLESHOOTING GUIDES
ARE LOCATED ON THE BACK OF THE MANUAL
Installation
And
User
Manual
(Rev. 102804NP)
Vista de página 0
1 2 3 4 5 6 ... 27 28

Resumo do Conteúdo

Página 1 - Installation

CARBON MONOXIDE MONITORINGAND SHUTDOWN SYSTEMMODEL 12VQUICK INSTALLATION TIPS AND TROUBLESHOOTING GUIDES ARE LOCATED ON THE BACK OF THE MANUALInstalla

Página 2

UNDERSTANDING THE ULTRAGUARD ZONESIf you intend to connect the UltraGuard to an alarm panel please take time to read this section. Understanding how U

Página 3 - Table of Contents

ZONED MODEFigure 4 shows how the UltraGuard Monitor distributes the signals in the ZONED mode.Z1 ALARM, Z2 ALARM, Z3 ALARM, and Z4 ALARM can output ON

Página 4 - INTRODUCTION

Example II.There are 7 detectors installed. 5  on Zone 1 and 2  on Zone 2.Scenario 1. There are 4 Alarm Panel Zones available.All the features  CO

Página 5

MONITOR PLACEMENTThe UltraGuard Monitor may be placed on any wall that provides convenient access to the furnace emergency shut off switchwiring. For

Página 6

CO DETECTOR INSTALLATION INSTRUCTIONSSelect proper location (SEE PAGE 10)A mounting plate is provided on the back of the CO Detector. Remove the moun

Página 7 - CO DETECTOR FEATURES

SINGLE DETECTOR ON A ZONE CONNECTIONIf a zone has only one detector all the EOLRs and a jumper must be installed on this detectors board (see figures

Página 8 - PRODUCT DATA

MULTIPLE DETECTORS PER ZONE.With multiple detectors per zone 4-wire connections between the first detector on a zone and the UltraGuard Monitor and 6-

Página 9 - INSTALLATION

To make your CO Detector tamper resistant, a locking pin has been provided in the bagwith the screws and anchors. Using this pin will deter children

Página 10 - Figure 3. UltraGuard Zones

MONITOR INSTALLATIONThe UltraGuard Monitor is designed to be mounted in a wall with the three-gang electrical box provided. The UltraGuard 12Vmust nev

Página 11

All low voltage wiring should be stripped back ¼ from the end for insertion into the removable plug. NEVER allow bare wireto extend above the connect

Página 12 - Temperature

Dear New UltraGuard Owner:Congratulations, you have taken an important step to help insure the health andsafety of you and your family. We are proud t

Página 13 - DETECTORS PLACEMENT

FURNACE WIRINGCAUTION: Always verify that the power to the furnace has been turned off before proceeding. Be sure to turn offthe furnace circuit break

Página 14

POWER CONNECTIONFrom the selected 12V power source strip the insulation back ¼ on the two conductor power cord. Connect the (12VDC) powerto the two-p

Página 15 - (Power Limited)

TEST THE SYSTEMTest the system immediately following installation and weekly for proper operation.Test each detector by pushing the test button until

Página 16

FIRE ALARM PANEL CONNECTIONSIf you plan to connect the UltraGuard 12V to a fire alarm panel you may need to take into consideration that some fire ala

Página 17 - Figure 14

MAINTENANCECLEANING YOUR DETECTOR· Keep your CO Detectors cleando not wash.· To clean your Detector remove it from the mounting bracket.· You can cle

Página 18 - MONITOR INSTALLATION

WHAT YOU SHOULD KNOW ABOUT CARBON MONOXIDECarbon Monoxide (CO) is an insidious poison that can cause death. It is a colorless, odorless and tasteless

Página 19 - Figure 16

LIMITED WARRANTYElectronic Control Systems (ECS) offers you this limited warranty on your new UltraGuard Monitor,including all of its component parts.

Página 20 - Figure 19. Furnace wiring

TROUBLESHOOTING INSTRUCTIONSTROUBLE PROBABLE CAUSE AND SOLUTIONNo lights of any kind Check the power to the ULTRAGUARD . J1 pin 1&2 should have12V

Página 21

QUICK HINTS TO SIMPLIFY THE ULTRAGUARD INSTALLATIONRead the full instructions to get a complete overview.If the UltraGuard Monitor is to be connected

Página 22

Table of ContentsINTRODUCTION...

Página 23 - (Power Limited To 250 mA)

In Canada this equipment may not be used incommercial/industrial installations!INTRODUCTIONUltraGuard 12V is an interactive alarm system prima

Página 24 - MAINTENANCE

Seven indicator lights on the front panel keep the user aware of the status of each function.Five types of faults are indicated by a repeating pattern

Página 25

ULTRAGUARD FRONT PANEL INDICATORSj Reset ButtonUsed to reset the system under various conditions.Please refer to appropriate sections of this manual

Página 26

CAUTION: The UltraGuard 12V System relies on the integrity of the attached CO Detector(s) to provide both thealarm panel signal and to turn the furnac

Página 27 - TROUBLESHOOTING INSTRUCTIONS

PRODUCT DATAULTRAGUARD 12V CARBON MONOXIDE MONITORPower:Canadian installations must be in compliance with the Canadian Electrical Code for a conduit o

Página 28

INSTALLATIONTo avoid common errors, unnecessary troubleshooting and make the installation more efficient we suggest the following installationsequence

Comentários a estes Manuais

Sem comentários